Main stages of repair works in the apartment

Main phases of repair works in the apartment.

How to begin repair works of the apartment?

The first phase of the repair work of old homes is the damage and dismantling firstly of the worn out walls and partition walls, getting rid of the wall and ceiling covering. This stage is among the most "unclean" stages of the repair.

One more among the most crucial and "dusty" works is the window block replacement. It is required to do this to start with www.fixitrightplumbing.com since dirt and dust will be unallowable throughout following phases and it is prohibited at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is needed to load them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following phase is electrical wiring. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipes to guarantee electrical safety and boost reliability. The pipe protects wiring from external damages and allows to replace the wire entirely without breaking walls and flooring just by placing the new wire instead of the old one.

House Painting follows the circuitry. The regular mistake during the simultaneous conducting of such works occurs when employees forget to set out one of the cables and house painters have actually currently plastered and smoothed out the wall. As an outcome, extra works are needed to seal chases on the finished wall. The locations of the feed switch and wall outlet location and their number should be thought-out ahead of time. The scheme of power circuitry is generally consisted of into the design project.

Later on the system must be all set to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable television are set out. The power cable television should not be laid out near the telephone and antenna cables fixitrightplumbing.com to prevent sound pickup and disturbance. The most strange minute is setting out the TV cable. In order to make 2 (or 3) TV sets in the apartment the second cable television is often simply "firmly soldered" in parallel, so the cable television resistance is decreased. As an outcome, the screen quality is deteriorated, numerous programs can't be gotten and etc. In order to prevent such situation it is essential to invite a professional with special devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is carried out at the same time in all properties, if it is possible. Delays are linked with the technology. Each used layer of the plaster (or completing finishing) should dry totally before the work will continue.

image

Works in hygienic arrangements and the cooking area begin simultaneously with home painting. It is better to fulfill so-called "dirty" works in the first place and concurrently. In accordance with the plan of the sanitary technician location welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in sanitary plans are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this phase in order to conserve their surface area appearance. The surface puttying of walls is conducted at the same time. The highly precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the process of fill. Fill can be made with different products-- from normal masonry cement-sand mix to self-aligning floorings. The benefit of the easy mixture is its cheapness, the drawback is that such mixture is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next stage of the work with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floors are a lot more costly, however more technological. Lining up occurs nearly "instantly" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account thickness of future floor covering. After installation the door can be taken off its hinges and eliminated until the end of repair or loaded into polyethylene film to safeguard from damages. Concurrently ceiling can be painted and the tile can be laid in that properties where it was planned. The tile must be laid on the definitely dry overlay.

Finishing of the flooring mounting depends on the prepared covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where surface covering of the flooring is laminated floor covering or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out consequence is linked just with such rushing procedure when the terrific quantity of dust is developed. In spite of the reality that great floor mills are geared up with the vacuum, the enough quantity of dust is precipitated on surrounding topics consisting of walls. Dust is really acerbic and is terribly washed off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

image

After this the main works can be thought about to be ended up. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is needed to note that the sequence of works was noted in basic and can change depending upon the certain scenario-- the variety of spaces in property, your resources, peculiarities of the building of the multilevel facilities. It is based upon common sense and every person capable of analysis can independently create such a sequence.